It took about 6 hours and nearly everything was removed from the bike to get it ready to cut off the rear suspension in preparation for a hardtail rebuild. I was able to hook up with Elswick and they fabricated an extended (3"-4") and lowered (2"-3") weld-on hardtail for me. Took about a week and I was very impressed with the quality of the welds.
No comments:
Post a Comment